Industrial concrete floors and repairs engineered for durability and reliability

CLF Workshop Epoxy Floor

CLF Workshop Floor before the makeover
CLF Team Grind the floor
CLF Dura Top 410 is applied onto the floor, with a primer placed before.
An Epoxy Primer is placed after 24 hours
2 Coats of Epoxy Screed Applied
A Sealer and Surface Hardener is Applied
The floor is ready to be used
CLF Workshop Floor in full function again with new Epoxy Floor.

Recent Projects

Case Study: Linbro Park Development

Case Study: Premier Valves

Diamond Dock System, Hilti Warehouse